Proper installation is critical to the
performance, integrity and credibility of your Vibration Monitoring or Information System.
A proper installation is dependent on, quality design and planning, quality workmanship,
training, and proper configuration/programming of your vibration monitoring system.
Several
levels of Field Service are available for your convenience and budget. First time users of
vibration monitoring equipment and information systems usually require more assistance
than those who have completed several installations. In many cases even experienced
customers simply do not have the manpower available during crucial overhaul periods to
properly complete system installation without assistance.
The following services are available from our Field Service Group and your requirements
may of course be customized depending on your circumstances and requirements.
- Pre-Installation Survey
- Installation Assistance
- Startup and Calibration
- Complete Turnkeys
- Training
Pre-Installation Engineering
The purpose of the pre-installation engineering is to finalize as many details as possible
as to the system installation. A site survey is completed and detailed drawings and
documentation are prepared to guide the customer in completing the actual installation.
Site (Machine) Survey
- Machine Survey
- Available Documentation Survey
- Transducer Application Review
- Transducer Installation Methods
- Junction Box Locations
- Conduit Layout
- Monitor Location and Mounting
- Alarm (Relay) Requirements and Logic
- Startup Contact Requirements
- Recorder Output Requirements
Office Engineering
- Machine Layout Drawing
- Transducer Installation Detail Drawing
- Transducer Bracket Design
- Bracket Fabrication Drawings
- Conduit and Instrument Wire Drawings
- Purchase Order Review
- Formal Report with Drawings
Installation Assistance
In many cases customers desire on site supervision during system installation. Our Field
Service Technician will supervise and assist in all phases of the actual installation to
insure system reliability and integrity.
- Transducer Installation
- Monitor Installation
- Instrument wire terminations
Startup and Calibration
The most often performed service, Startup and Calibration includes the following after the
preliminary installation has been completed by the customer:
- Transducer calibration check
- Transducer mounting (gap) check
- Wire termination Check
- Monitor Power Up
- Monitor Configuration and Programming
- Monitor calibration
- Baseline machine information
- Formal Report
Turnkey
In some cases customers may elect to have a Turnkey performed due to manpower or time
shortages. Turnkeys remove almost all planning and manpower requirements from the
customer. We will take responsibility for all facets of the installation from transducer
installation, conduit and wire, to monitor installation and programming. Extensive
documentation packages are included for future reference.
Turnkeys require advanced planning and a prior site visit by one of our Field Service
Representatives where your requirements, installation details, electrical and mechanical
contractors can be discussed.
The basic steps to complete a turnkey are:
- Site Visit
- Preparation of Bid Documents
- Purchase Order
- Preliminary Design Documents
- Electrical Work (Conduit, J-Boxes and Wire)
- Machine Shutdown
- Mechanical Work (Machining/Drill & Tap)
- Transducer Installation
- Monitor Installation
- Wiring Terminations
- Startup and Calibration
- Training
- Final Report and Documentation
Training
Training is an integral part of a successful Vibration System Startup. Operators must be
instructed in the use of the system, Instrument Technicians must be instructed as to the
care and maintenance of the system. Training may be customized for each plants
requirements and needs.
- Basic Vibration Training
- Transducer Theory and Operation
- Operator Monitor Training
- Instrument Technician Training
Customer Responsibility
The customer normally takes responsibility for the following items except in the case of a
Turnkey project or if other arrangements have been made:
- Machine preparation including:
- Bearing Drilling and Tapping
- Bearing Machining if required
- Transducer Installation
- Junction Box Installation
- Conduit Installation
- Instrument wire pulls
- Wire Terminations
- Panel Cutout and preparation
- AC Power for Monitor
- Installation of Monitor
Project Checklist
Pre-Installation:
- Application Review
- Plant Objectives
- Transducer Call-out
- System Call-out
- Purchase Vib. System
System Design:
- Transducer Installation Details
- Mounting Design
- Bracket Design
- Field Wiring Layout
- Junction Box Layout
- Conduit Layout
- Transducer Field Wiring
- AC Power
- Recorder Outputs
- Relay Outputs
- Digital Communications
- Monitor/Mux. Installation Details
- Custom Panel Design (if required)
- Bill of Materials
- Purchase Non-IRD Supplied Materials
Installation:
- Install Monitor/Host/Mux.
- Install Conduit
- Pull Wire:
- Transducer Instrument Wire
- AC Power
- Recorder Outputs
- Relay Outputs
- Digital Communications
- Fabricate Brackets/Adapters
- Prepare Brgs/Caps (Drill/Tap)
- Prepare Notch/Proj. for Speed/Phase
- Install Transducers
- Install Flex. Conduit & Trans. Wire
- Terminate Field Wiring
Start-up and Calibration:
- Wiring Check
- Power up System
- Calibrate System
- Install/Program Software/Firmware
- System Start-up
- Validate System
- Training
- System Acceptance\Sign-off
|